UK Feed in Tariff Rates 2018 – All Technologies

by

This page lists the current Feed in Tariff rates for the various technologies under the FIT scheme. Each technology has different tariff rates. The rates given change quarterly, reducing over time. Tariff rates are set based on installation date and guaranteed. The rate set based on your installation date remains the rate you receive for the whole 20 year term of the scheme. The current quarter runs from April 1st 2018 to June 30th 2018 and tariff rates are included in the tables below.

This page will be updated as new rates are announced.

How Much Can You Earn With Solar Panels

Solar PV Feed in Tariff Rates 2017

 

Type of Solar Installation 1st April to 30th June 2018
(p/kWh)
Solar photovoltaic with Total Installed Capacity of 10kW or less (other than stand-alone) Higher rate
Middle rate
Lower rate
4.01
3.61
0.31
Solar photovoltaic (other than stand-alone) with Total Installed Capacity greater than 10kW but not exceeding 50kW Higher rate
Middle rate
Lower rate
4.25
3.83
0.31
Solar photovoltaic (other than stand-alone) with Total Installed Capacity greater than 50kW but not exceeding 250kW Higher rate
Middle rate
Lower rate
1.85
1.67
0.31
Solar photovoltaic (other than stand-alone) with Total Installed Capacity greater than 250kW but not exceeding 1MW 1.50
Solar photovoltaic (other than stand-alone) with Total Installed Capacity greater than 1MW 0.31
Stand-alone (autonomous) solar photovoltaic (not attached to a building and not wired to provide electricity to an occupied building) 0.15
EXPORT TARIFF 5.24
How Much Can You Earn With Solar Panels

Feed in Tariff Rates for Wind Turbines

Description 1st April to 30th June 2018
(p/kWh)
Wind with total installed capacity of 50kW or
less
8.46
Wind with total installed capacity greater than
50kW but not exceeding 100kW
5.01
Wind with total installed capacity greater than
100kW but not exceeding 1.5MW
2.15
Wind with total installed capacity exceeding 1.5MW 0.66

Anaerobic Digestion Feed in Tariff Rates

Description 1st April to 30th June 2018
(p/kWh)
Anaerobic digestion with total installed capacity of 250kW or less 4.60
Anaerobic digestion with total installed capacity greater than
250kW but not exceeding 500kW
4.36
Anaerobic digestion with total installed capacity greater than 500kW 1.61

Feed in Tariff Rates for Hydro

Description 1st April to 30th June 2018
(p/kWh)
Hydro with total installed capacity of 100kW
or less
8.07
Hydro with total installed capacity greater
than 100kW but not exceeding 500kW
6.49
Hydro with total installed capacity greater
than 500kW but not exceeding 2 MW
6.49
Hydro with total installed capacity greater than 2 MW 4.73

FIT Rates for Combined Heat and Power (CHP)

Description 1st April to 30th June 2018
(p/kWh)
Combined Heat and Power with total installed capacity less
than 2kW
14.52

Export Tariff 2018

Description 1st April to 30th June 2018
(p/kWh)
All Eligible Installations 5.24
This entry was posted in Clean Energy, Feed in Tariffs, Grants / Funding. Bookmark the permalink.

If you have any thoughts on these issues we'd love to hear your comments on our Google+ page or twitter @GreenBizWatchUK.

How Much Can You Earn With Solar Panels

Comments are closed.